Best Oracle Primavera Courses

Find the best online Oracle Primavera Courses for you. The courses are sorted based on popularity and user ratings. We do not allow paid placements in any of our rankings. We also have a separate page listing only the Free Oracle Primavera Courses.

The Complete Oracle SQL Certification Course

Don't Just Learn the SQL Language, Become Job-Ready and Launch Your Career as a Certified Oracle SQL Developer!

Created by Imtiaz Ahmad - Senior Software Engineer & Trainer @ Job Ready Programmer

"]

Students: 106525, Price: $149.99

Students: 106525, Price:  Paid

LAST UPDATED: November 2020

(Source Code Included for Lectures)

Get ready to acquire some seriously marketable programming skills! You can't consider yourself a complete end to end developer until you can code in SQL. Today, data has become the hottest topic in technology and a company's biggest asset is their data. All databases require the language SQL to store and retrieve data. Salaries for junior level SQL Developers are upwards of $70,000 - $90,000 dollars a year! The great thing is, for this course, you do not need any prior experience in programming what so ever. SQL is a different animal and we're going to demystify the language from scratch and prepare you with plenty of progressively challenging assignments so that by the time you've completed the course (in 2 months), you can call your self an Oracle SQL Master! Oracle is the most popular relational database in the world! This course will prepare you to be job-ready in just 1 month of study and practice.

All exercises and solutions are in the lectures. In several lectures I ask students to pause the video and complete the assignment before resuming to watch my solution. MAKE SURE YOU WORK OUT THE PROBLEMS ON YOUR OWN BEFORE MOVING ON TO MY SOLUTION!!

With over 62,000 enrolled students and a 4.5 star-rating, this is a Udemy best-selling course.

Do you have no prior experience in SQL development? This course is perfect for you. Don't take it from me, take it from actual students that took this course:

"I am a beginner and the way this course starts is perfect for the person who has no introduction of SQL or Oracle."

Do you have prior experience, but need a refresher or to fine-tune your skills? This is the course for you. Again, I'll let my students do the talking:

"I had a good base of knowledge from my last employment. This course is constantly proving useful to supercharge my actual knowledge base. Very good one!"

Have you taken a SQL course before, but felt confused on certain topics or not completely satisfied in your abilities? A lot of my students had shared similar concerns:

"I had previously taken a college course about databases and SQL, but these ten hours of content were more clear and useful than the course and textbook."

Topics covered in this course :

  • Basics of Tables

  • SELECT and WHERE Clause

  • WHERE, AND & OR with Operators

  • BETWEEN, IN and NULL

  • Single Table Queries

  • Single Row Functions

  • Grouping Functions

  • GROUP BY and HAVING Clause

  • Joins

  • Inner and Outer Joins

  • EXISTS & NOT EXIST Operators

  • Creating Your Own Tables

  • Using ALTER

  • Creating Tables with SELECT & UPDATE Data

  • DELETE, TRUNCATE, and DROP Commands

  • System Tables, Pseudo Columns & Deleting Duplicates (Newly Added)

  • Views and Other Objects and Commands (Newly Added)

The Complete Oracle SQL Bootcamp (2021)

Become an In-demand SQL Professional & Pass Oracle SQL 1Z0-071 (OCA) Certification Exam Confidently!

Created by Oracle Master Training • 100,000+ Students Worldwide - Oracle Architect & Best Selling Instructor

"]

Students: 30585, Price: $109.99

Students: 30585, Price:  Paid

Last Course Updates:

(May, 2021): 3-Real SQL(200+ High-Quality Questions) Certification Exam Samples are added!

(Apr, 2021): New Lectures and Quiz Questions are added!

(Feb, 2021): Closed-Captions are updated!

Important Notice: This course will be continuously getting updated with more lectures, quizzes, assessments to enhance your knowledge on Oracle SQL.

Are you a student ready to learn SQL for your lessons?

Do you want to get a better job?

Are you bored with watching a lot of stuff, but could not learn anything?

Do you think you know SQL, but you cannot write SQL codes?

Are you looking for a really professional course?

Then this is the course you are looking for.

You have come to the right place!

In this course, all the subjects are explained in a professional order.

   If you are new to SQL, no problem! You can easily learn with all the details of SQL. If you already know SQL and want to improve, this course explains all the details including all of the subjects.

   After completing this course, you will learn all that you need to know. If you don't see something in this course, it means you really don't need to know it for now.

   Coding can be learned with coding. A course that has no example is not a course at all. And there are hundreds and hundreds of codes in this course.

So come on, what are you waiting for?

Get this course, and go get a better job!

Benefits of Taking This SQL Course:

Knowing SQL can get you a better job or improve the one you have and it can earn you $80-100k+ in the IT Industry. It's a skill that will put you more in demand in the biggest technology companies in the IT industry, and make your software life easier, this is why it's so popular and backed by Oracle.

This course will help you quickly get up to speed with Oracle SQL. I will demystify the query skill and help you understand the essential concepts of how to write SQL codes easily and thinking analytically against the problem in your company.

Student Reviews Prove This Course's Worth:

Those who have reviewed the course have pointed out that the instruction is clear and easy to follow, as well as thorough and highly informative. Other students enjoy the use of relevant examples throughout the course, as these make the content even easier to comprehend.

Many students had also taken other SQL courses in the past, only to find that this SQL course was their favorite. They enjoyed the structure of the content and the high-quality audio/video.

Check out all of the great reviews in the review section ... a lot of happy students :-)

Important Notice:

Knowing SQL is "mandatory" for any IT Professionals and having good SQL knowledge will be a "GREAT PLUS" for you!

If you want to Become a Job-Ready SQL Professional who can pass any Oracle SQL Exam confidently, this course will be the next step for you!

So let’s do this! I'll see you in the first lecture!

Primavera P6 Complete Course of Project Planning 2020

Complete course from program inception to reporting

Created by Prime Project Control - Project Controlling at its Best

"]

Students: 17400, Price: $89.99

Students: 17400, Price:  Paid

Project Management is not complete without a reliable and strong programing tools to develop project plan, logically linking activities, resource loading, project monitoring and reporting.

The strong reliable partner in Planning Software widely used in the world presently is Primavera p6 from oracle. This planning software is widely used across industries from manufacturing, defense, shipping, oil and gas, construction and software development projects.

The course aims to disseminate practical application of Primavera P6 for aspiring project manager, planners, schedulers, project developers and owners. The simplified learning process and methodology adopted by Prime Project Control, takes you on smooth, easy but completely packed  learning experience and ensures that you have acquired most of the practical application of the Primavera P6 software in short course duration.

I wish you to have enjoyable learning experience and pray that you would be successful in your aspirations. Please feel free to write a feedback on the course upon completing.

Best Regards!

Team, Prime Project Control

Project Management with Primavera P6

Learn practical application of Project Management using Primavera P6 software, version 8.3 or above.

Created by CEM Solutions - Construction Engineering and Project Management Consultants

"]

Students: 8852, Price: $129.99

Students: 8852, Price:  Paid

Welcome to Oracle Primavera P6 online training course. This course is named as 'Project Management with Primavera P6' as it is focused on practical application of Project Management using Primavera P6. This course was being taught by CEM Solutions for over 10 years. And now it is available online so that maximum students and professionals can learn this valuable resource from their desktops with convenience. 

This course is a field oriented course and contains real world examples and a full fledge real project for better understanding and practice.

This course is so designed that it covers every aspect of implementation. If you are working in large scale firms then you will get a picture of how projects are managed there. This will make you able to organize projects, control access to projects, organize and control resources and in effectively planning, monitoring and controlling of the project.

Similarly if you are working in small or a medium scale firm, or if you are new to Project Management and Primavera, you will get to know all the required core concepts of Project Management along with examples and you will learn their implementation in Primavera P6 from start to end.

After successful completion of this course, you will be able to develop a schedule, update and monitor this schedule, control this schedule, generate reports, allocate cost and resources, develop cash flows and s-curves, monitor and control cost and resources and you will also understand lots of interesting Project Management concepts.

Primavera P6 Advanced Training

Learn the advanced scheduling functions of Primavera P6.

Created by Umer Mushtaq Lone - MSc, PMP, M.ASCE, Oracle Certified Specialist.

"]

Students: 4998, Price: $99.99

Students: 4998, Price:  Paid

This course offers one of the most comprehensive online tutorials for learning advanced concepts of Primavera P6. The course teaches more than 30 advanced functions of Primavera P6 such as:

  • Activity Codes
  • Filters
  • Group & Sort
  • Currency & Units of Measure
  • Constraints
  • Progress Spotlight
  • Global Changes
  • Renaming Activity IDs
  • Percentage Completes
  • Scheduling Options
  • Baselines
  • Reflections
  • Suspend & Resume Function
  • Percent Complete Types
  • Activity & Resource Spreadsheets of P6
  • User Defined Fields (UDFs)
  • Look Ahead Plans
  • Reports
  • Crashing & Fast Tracking
  • Schedule Layouts
  • Claim Digger/Schedule Comparison
  • Activity Types
  • Schedule Log
  • Indicators
  • Resource Assignment Window

Although the course is mainly based on Version 8.2 of Primavera, however, it can be used for learning up to the latest version 17 as there is no difference between the higher versions as such. Also important topics related to higher versions have been added as new lectures. Every concept is explained with on-screen video of Primavera P6. Combined with the free P6 course that I offer, the course will cover almost every important part of scheduling & planning in Primavera P6.

Please NOTE: This course does NOT teach theory of project scheduling or planning and is only meant to learn Primavera P6 as a planning and scheduling tool.

Planning & Control with Oracle Primavera P6 PPM Professional

There is an updated course available and covers P6 Version 8 to 20 and explains the differences between the versions.

Created by Paul E Harris - Planning Book Software Author and Publisher

"]

Students: 1426, Price: $99.99

Students: 1426, Price:  Paid

ABOUT THE COURSE

This course aims to teach participants:

  • Introduction to the user interface,

  • How to plan projects without resources,

  • Filters layouts, printing,

  • Baselines and Updating an un-resourced project,

  • Creating and assigning roles and resources,

  • Controlling projects with resources and costs,

  • Setting up and administering a database,

  • Plus some advanced features including Import/Export, Activity Codes, Custom Data Fields and Global Change.

The following people should consider attending this course:

  • Programme Managers and Project Control staff evaluating the software against your organisational requirements.

  • Project schedulers who wish to learn how to use the software to schedule and control projects.

  • Database managers who wish to understand how to set up and administer a database.

  • Experienced project personal who wish to learn how to schedule and control a project.

Students should have:

  • The ability to use a personal computer and understand the fundamentals of the operating system,

  • Experience using application software such as Microsoft Office and

  • An understanding of how projects are planned, scheduled and controlled, including understanding the project management processes applicable to your projects.

COURSE CONTENTS

  1. Introduction

  2. Creating a Project Plan

  3. Starting Up and Navigation

  4. Creating a New Project

  5. Defining Calendars

  6. Creating a Primavera Project WBS

  7. Adding Activities and Organizing Under The WBS

  8. Formatting the Display

  9. Adding Relationships

  10. Activity Network View

  11. Constraints

  12. Group, Sort and Layouts

  13. Filters

  14. Printing, Reports and Visualizer

  15. Scheduling Options and Setting a Baseline

  16. Updating an Unresourced Schedule

  17. User and Administration Preferences

  18. Creating Roles and Resources

  19. Assigning Roles, Resources and Expenses

  20. Resource Optimization

  21. Updating a Resourced Schedule

  22. Other Methods of Organizing Project Data, Activity Codes and User Defined Fields

  23. Global Change

  24. Managing the Enterprise Environment

  25. Multiple Project Scheduling

  26. Utilities, Reflection Projects, Audit Trail, Import and Export

  27. Earned Value Management with P6

Primavera P6 Professional Training

Primavera P6 Project Management Complete Professional Course For All Levels

Created by Mudessar Afraz - Planning Engineer

"]

Students: 1365, Price: $99.99

Students: 1365, Price:  Paid

Welcome to Primavera P6 Professional online training course. it is focused on practical application of Project Management using Primavera P6.. 

This course is a field oriented course and contains real examples and a full fledge real project for better understanding

This course is so designed that it covers every aspect of implementation. If you are working in large scale firms then you will get a brief concept of how projects are managed there. This Course will make you able to organize projects, control access to projects, organize and control resources and in effectively planning, monitoring and controlling of the project.

Similarly if you are working in a Small Industry or if you are new to Project Management and Primavera, you will get to know all the required core concepts of Project Management along with examples and you will learn their implementation in Primavera P6 from start to end.

By the end of the course you will learn that to plan any project successfully you should have a great tool. Primavera P6 is that tool. Primavera P6 helps you in the planning phase of any project. You will also get to know how a construction schedule is created with the minimum data. You will get insights in the construction schedule

Some Of The Major Topics That We Will Cover In This Course:

· Critical Path Method

· O.B.S And EPS

· Calendar In Primavera

· How to Create Project W.B.S And Activities And How We Can Give Duration To Activities

· How to Give Relationship To Activities

· Type Of Relationships

· How to Schedule The Project

· How to Create And Assign Resources

· How to Create And Assign Baseline

· How to Update The Project

· Resource And Activity Usage Profile

· How to Create Reports

· Global Change

· Material Procurement In Primavera

· How to Generate Financial S Curve In Pirmavera

· Resource Histogram

· Earned Value Management (Very Important)

· Cost Account In Primavera

Oracle Primavera P6 Training – For Beginners

Quickly Build the Project Scheduling Basics using the Oracle Primavera P6 Professional Project Management Software

Created by Basharat Bhatti - MSc, PMP, ITIL, CQAP, SCSA

"]

Students: 1310, Price: $89.99

Students: 1310, Price:  Paid

This course is for the beginners only! For those who quickly want to learn the basic features of the Oracle Primavera P6, and especially useful for the learners who wish to learn the Primavera P6 fundamentals, for building their project schedules smoothly within no time.

The course covers the followings:

Enterprise Project Structure

Creating Project in Primavera P6

Work Break Down Structure

Project Activities and Activities Relationships

Creating and Assigning Resources

Assigning Cost

Calendars and Baseline

Constraints

Update and Maintain Schedule

Importing & Exporting Projects

Monitoring Project Activities

Printing

Learn Primavera P6 Ver17 (in Detail in Easy English & Steps)

More than 60 Features you will learn with videos and explanation. Explained with scenarios from practical situations.

Created by Abu Bakar - Project Management Trainer

"]

Students: 1031, Price: $199.99

Students: 1031, Price:  Paid

Course Contents 

1.Creating a Project
2. Customizing Calendars ( to adjust Working Days, Hours , holidays etc. )
3. Create WBS ( Work Breakdown Structure)
4. Creating Activities ( Defining ID, Name, Duration, Activity Types )
5. Setting Predecessors and Successors ( with Leads and Lags)
6. Computing / Calculating Schedule ( with Starts, Finish Dates , Floats,
Critical Path , Total Duration of the Project) 

7. View Network Diagram , Critical Path
8. Defining and Assigning Resources on the activities ( with Overtime
factor, Resource Rates, Per day maximum number of hours )
9. Defining New Currency ( e.g. Saudi Riyals )
10. Showing or hiding Columns and Tabs
11. Showing Project Total Cost and Breakdown ( on Labor, NonLabor,
Material wise and Activity and WBS wise breakdown and summaries)
12. Baselines
13. Activity Steps
14. Activity Codes
15. Grouping and Sorting 

17. Filtering Activities
18. Renumbering Activity IDs
19. Suspend and Resume Activities
20. Defining Units of Measurements ( UOM) e.g. Kg , Cubit Meter
etc)
21. Progress Spotlight
22. Global Change
23. Reflection
24. Import / Export
25. Printing Plans
26. Generating and Printing Reports 

27. User Defined Fields and Indicators
28. Resource Leveling
29. Resource Histograms / Resource Spreadsheets
30. Progress Update and Monitoring
31. Generating and Showing Earned Values ( including PV, EV, AC,
SV, CV, SPI, CPI, EAC, ETC, TCPI etc)
32. Text and Curtains
33. Issues, Thresholds and Risks
34. Expenses
35. Notebook 

36.Look ahead plans
37.Handling Negative Float
38.Saving and Restoring Layouts
39.Creating Project Website
40.Defining EPS ( Enterprise Projects Structure)
41.Defining OBS ( Organizational Breakdown Structure) 

Primavera P6 Professional Essential Training

Learn from NOTHING to EVERYTHING.

Created by Civil MDC - Professional Trainer

"]

Students: 953, Price: $89.99

Students: 953, Price:  Paid

This course will give you essential skills for the proper planning in Primavera P6.

This course covers all the fundamentals of using Primavera P6 Professional software. Through a series of lectures, interactive sessions and over practices on different types of exercises, participants will gain the knowledge and experience they need to use Primavera P6 software as an effective project management tool.

Primavera P6 Made Easy

Become an expert in the use of Primavera P6. From Foundation to Advance level

Created by Obalim Esedebe - Senior Consultant at Ciel Consulting,.

"]

Students: 934, Price: $99.99

Students: 934, Price:  Paid

Guaranteed to make you an expert in the use of Primavera P6. The course takes you through the basics to an advanced level in Primavera P6. We will show you how to download and install the Primavera P6 software free. You will learn about

Key Project Management Concepts needed to optimally use Oracle Primavera.

Gain Comprehensive Understanding of Primavera Interface

Define Work Breakdown Structure (WBS)

Add, Organize & Code Activities

Create a project schedule

Perform Resource Loading and Leveling

Set the Project Baseline

Update the Project Schedule

Understand Critical Path Method (CPM) Fundamentals and how it impacts the project

Track and monitor progress throughout the project lifecycle

Create Customized Reports as per the requirements of the project stakeholders

Create a project plan at the level of detail that is appropriate for your project

Course syllabus

The course covers the following topics

Calendar defining hourly & daily

Calendar weekly, monthly

Activities – definitions, sequencing & estimating duration

Effectively using the four types of PDM relationship

Scheduling the project

Monitoring & project controlling

Defining constraints & overcoming conflicts

Defining & assigning activity codes

Defining & assigning WBS codes

How to organize the activities by using activity codes & WBS codes

Reorganizing activities

Filtering activities

Defining project codes

Preparing resource information

How to apply resource to each activities

Estimating the cost of the project

How to analyze the resources by using resource profile & resource table

How to do resource leveling & resource smoothing using crasing , stretching & splitting

Scheduling multiple projects & preparing a master project

Updating the project progress & campaigning the actual progress with the baseline

Earned value management

Preparing different types of reports

How to prepare “S” curve

Highlighting the progress in the bar chart

How to manage risk

Complete Primavera P6 Training & Certification

Primavera P6 Professional Project Management Software

Created by Vivek PMP - PMP Certified Project Manager. 18+ Years Experience

"]

Students: 651, Price: $89.99

Students: 651, Price:  Paid

The course demonstrates the useful applications of software in project management and helps participants develop skills to handle projects using Primavera, covering all basic features of the software available over web and offline.

Participants learn planning, scheduling, and controlling of small and large scale projects; driving down costs, minimizing risks, and delivering results for key stakeholders. They are taught how to select the right strategic mix of projects; balance resource capacity and allocate best resources.

The course guides participants in tracking progress; monitoring and visualizing project performance; integrating project management tools with financial management and human capital management systems; synchronizing projects, structures, budgets and actual and synchronizing detailed project work plans, resource assignments, and progress.

  • Introduction to Project Management

  • Introduction to Primavera

  • Project Creation

  • Work Breakdown Structure

  • Calendars Creation

  • Activities Creation

  • Relationship Creation

  • Project Scheduling

  • Constraints application

  • Roles & Resources Creation

  • Assigning a Resources

  • Resource Analysis & Levelling

  • Baselines Creation

  • Updating Project Progress

  • Tracking Project Progress

  • Documents, Notebook & Feedback

  • Deals with Issues & Thresholds

  • User defined Fields

  • Reports creation

  • Import & Export

The course demonstrates the useful applications of software in project management and helps participants develop skills to handle projects using Primavera, covering all basic features of the software available over web and offline.

Participants learn planning, scheduling, and controlling of small and large scale projects; driving down costs, minimizing risks, and delivering results for key stakeholders. They are taught how to select the right strategic mix of projects; balance resource capacity and allocate best resources.

The course guides participants in tracking progress; monitoring and visualizing project performance; integrating project management tools with financial management and human capital management systems; synchronizing projects, structures, budgets and actual and synchronizing detailed project work plans, resource assignments, and progress.

Oracle Primavera P6 Training – Advance (Industry based)

Get Trained from an experienced trainer

Created by Er.Nikhil Raj - Senior Planning Engineer

"]

Students: 461, Price: $19.99

Students: 461, Price:  Paid

  1. My Course covers how to use primavera p6 in industry standards
  2. Here i am sharing my experience so that after this course, students can understand how primavera is been used in industries
  3. PMI Standards | Following PMBOK 5th Edition
  4. My methodology of teaching is , First i will explain the topic with an industry level examples, after understanding the concept i will open the software and demonstrate how it will be done
  5. 4 levels of training
    1. beginner
    2. advance
    3. expert
    4. professional
  6. course will be handled by Er.Nikhil Raj, Btech Civil, Senior Planning Engineer
  7. Course support is unlimited
  8. There is no compromise on quality

Primavera P6

Master project planning and scheduling with Primavera P6 (Basic & Advance)

Created by Mostafa Khorshidi, P.Eng, PMP, CSM - Project Manager

"]

Students: 366, Price: $89.99

Students: 366, Price:  Paid

Guarantee to become a professional in project planning and scheduling using Primavera P6.

What will you learn?

This offers one of the most seamless all-inclusive online tutorials for learning basic and advance topics of Primavera P6. It includes all the important parts of scheduling & planning of a project. This course provides you with valuable know-how about project management in practice with the following topics and steps:

1- Introduction to interface of the P6 software

2- Creating Enterprise Project Structure (EPS) and Organization Breakdown Structure (OBS)

3- Creating a project and adding Work Breakdown Structure (WBS) to your project.

4- Creating activities and adding relations between the activities and finding the critical path

5- Adding and assigning resources

6- Adding expenses

7- Creating and assign baselines

8- Updating project status

9- Exporting and Printing Gantt Chart

In addition to the principals, you will have access to advance tips and tricks such as:

10- General tips

          a. Indicators for schedule Status

          b. Customize Calendars

          c. Currencies and Unit of measures

          d. Filters

          e. Group and Sort

          f. Global Change

         g. User Defined fields.

11- Activity

         a. Types

         b. Steps

         c. Codes

        d. Renaming activities IDS

        e. Percentage complete type

        f. Activity constraints

12- Resources

        a. Resources usage spreadsheets and histograms.

13- Earned Value and S-Curve analyses

14- Schedule compression techniques

15- Add and assigning risks

16- Reporting

---------------------------------

Here is what you will receive with your enrollment:

  • High-quality video lectures that explain the different terms and concepts with real world examples and applications.

  • 1-on-1 expert Instructor support to answer your questions or clear up any confusion you might have.

  • Lifetime access with no expiration so you can complete the course at your own pace, anywhere, on any device and come back for a refresher at any time.

  • Free course updates so you can continue to benefit from enhancements made to this course.

---------------------------------

How will this help you?

  • You will be able to deliver projects plans, schedules quickly.

  • You will go fully prepared to a job that requires knowledge in project planning and scheduling.

  • Upon completing this course you will receive Certificate of Completion, a Certified Digital Badge.

  • You will be able to add this to your CV (just put it under "Professional Development" , Udemy and Year of Completion). This will help you land more jobs!

  • What you will learn will make you effective and successful

---------------------------------

What are the advantages of Primavera P6 in project planning and scheduling?

  • In P6 you can manage project, programs and portfolios at the same platform easily

  • User friendly environment and easy to navigate different projects at the same time

  • Parametric structure which means you can code, you can customize whatever you want by combining different parameters.

  • And there are many more advantages, but you'll learn more about that as you go through the course

  • Ability to collaborate with your colleagues in developing a project by using the cloud service

  • Powerful tools for reporting and presentation to higher mangers.

---------------------------------

Does this course include a Certification?

Yes, you will receive an Primavera P6 Certification upon completion of this course (a Udemy Certificate of Completion which you can download as a pdf).

Does a Udemy Certification have any value in the real world?

Of course it does! Even though Udemy is not a University and does not provide "accredited" certifications (like the one you would get from a University), Udemy is the most important online education platform in the modern world with over 40 Million users worldwide. So it definitely carries weight and is increasingly becoming recognized worldwide. So rest assured adding this Primavera P6 Certification to your CV increases your probability of getting that dream job.

Primavera P6, Planning, Cost, Project Control + Full Support

Oracle Primavera P6, Planning, Cost & Project Control

Created by Sama Tamhidi - Project Control Head

"]

Students: 360, Price: $49.99

Students: 360, Price:  Paid

In this Trip which we start Together you will learn from basic to advanced level of primavera to prepare a complete work schedule also analyzing and tracking of Duplex Villa with a user friend environment and with a lifetime Great Support:

(Please see the Course Content)

Basic

1. Why Scheduling?

2. Why Primavera?

3. Setting Up

4. General Acquaintance

5. Portfolio

6. OBS

7. EPS

8. Calendar

9. Project

Quiz 1: Primavera Basic Quizzes

Intermediate

10. WBS

11. Activity

12. Relationships

13. Important Notes ( Schedule, Log, Float)

14. Duration % Complete

15. Physical % Complete

16. Resources

17. Unit % Complete

18. Activity Codes

19. Baseline

Quiz 2: Primavera Intermediate Quizzes

Advanced

20. Update

21. Tracking

22. Analyze A (Earned Value Management)

23. Analyze B (Filtering Management)

24. Report

25. Visualizer

Quiz 3: Primavera Advanced Quizzes

Add-ons

26. Cash Flow (Advance payment and Retention Included)

27. Contract types

28. Admin Tabs

29. Expenses

30. Group & Sort

31. Filter Layout

32. Roles

33. Risks

34. WPs & Docs

35. Resource Leveling & Resource Curve

36. Cook WBS and Activity

37. Financial Period

38. print

+ Bonus:

39. Unknown Activity Delivery Date

40.Import & Export between Primavera and Microsoft Excel

++ Great Support and Constantly Updates

As the quality Course is so important for us, we have individual supports that you can ask your questions and issues from us and also we constantly check what is important and what do you need to know more from primavera to hasten your analyzes in projects.

We would be happy to see you in this Trip.

Primavera P6 for Beginners

Learn Primavera P6 from scratch

Created by Gavin Drysdale - Project Controls Specialist

"]

Students: 349, Price: $99.99

Students: 349, Price:  Paid

This course covers the fundamentals for creating a project in Primavera P6.  The course objectives cover all of the basic scheduling concepts to successfully develop a project schedule, ranging from small to mega projects.

The course content applies all of the P6 releases from Version 8.3 onwards.

If you are a Project Manager, Project Scheduler, Project Controller, Engineer, Cost Controller, or anyone else who wishes to learn the fundamentals of P6, then this course is for you. All relevant reference material will be available for download.

You could also be migrating your skills from one of the other Planning Software Packages and want to get up and running quickly in Primavera P6.

You will find that the principles of scheduling you will learn in this course follow the guidelines for the DCMA 14-point Schedule Assessment Checking. This is often a pre-requisite of many companies today.

As with all of my courses, I provide a comprehensive real-life exercise (that I have personally worked on) for students to complete in their own time. Answers to exercise questions will be provided in the final session. I encourage all students to complete the exercise.

If you would like an eBook (90 pages) for this course, details will be provided in the Bonus Learning Section at the end of the course.

Oracle Primavera P6 – Project Management

Become a project management expert! Upgrade your project managing skills with Primavera P6

Created by RanjithKumar Vasudevan - Planning Engineer by profession & Primavera tutor at Udemy

"]

Students: 256, Price: $89.99

Students: 256, Price:  Paid

In this course, application of basic and advance techniques of Oracle Primavera P6 in managing projects explained in detail covering all modules available in the tool.

For the ease of learners, the course is splitted into 6 sessions

1. Introduction to Project management, Creation of Currency, EPS, OBS, Projects, Notebooks and funding sources,

2. Creation of calendar, Resources and roles, cost accounts, resource codes and resource shifts, Project portfolios .

3. Introduction to scheduling, Creation of WBS, Activities, Activity relationship, activity step templates creation, total float and free float and resource assignments.

4. Creation and assigning Baselines, Expenses, Wps and Docs, Issues management, Risks identification and management,  creating thresholds parameters and monitoring thersholds.

5. Budget allocation and tracking, Spending plan, Resource usage distribution, creation and assigning of resource curves, resource levelling, Actuals updation, Gantt charts, Delay analysis, Global change

6. Brief on Earned value management, Creation of Earned value layout , Earned value and S curves analysis on project tracking, Report generations

Resource Management with Primavera P6 PPM Professional

There is an updated course available and covers P6 Version 8 to 20 and explains the differences between the versions.

Created by Paul E Harris - Planning Book Software Author and Publisher

"]

Students: 211, Price: $39.99

Students: 211, Price:  Paid

This course aims to teach participants:

USER AND ADMINISTRATION PREFERENCES AND SCHEDULING OPTIONS

  • User Preferences

  • Admin Menu

  • Admin Preferences

CREATING ROLES AND RESOURCES

  • Understanding Resources and Roles

  • Creating Roles

  • Creating Resources and the Resources Window

ASSIGNING ROLES, RESOURCES AND EXPENSES

  • Assigning Roles, Resources and Expenses

  • Understanding Resource Calculations and Terminology

  • Project Window Resource Preferences User Preferences Applicable to Assigning Resources

  • Activities Window Resource Preferences and Defaults

  • Assigning and Removing Roles

  • Assigning and Removing Resources

  • Resource and Activity Duration Calculation and Resource Lags

  • Expenses

  • Suggested Setup for Creating a Resourced Schedule

RESOURCE OPTIMIZATION

  • Resource Optimization

  • Reviewing Resource Loading

  • Resource Assignments Window

  • Copying and Pasting into Excel

  • Other Tools for Histograms and Tables

  • Methods of Resolving Resource Peaks and Conflicts Resource Leveling

  • Leveling Examples

  • Resource Shifts

  • Guidelines for Leveling

  • What to look for if Resources are Not Leveling

UPDATING A RESOURCED SCHEDULE

  • Introduction Budget Values & Baseline Projects, Data Date, Required Information to Update Project

  • Window Defaults for Updating a Resourced Schedule

  • Percent Complete Types,

  • Using Steps to Calculate Activity Percent Complete

  • Updating the Schedule, Updating Resources,

  • Updating Expenses

The following people should consider attending this course:

  • Programme Managers and Project Control staff evaluating the software against your organisational requirements.

  • Project schedulers who wish to learn how to use the software to schedule and control projects.

  • Database managers who wish to understand how to set up and administer a database.

  • Experienced project personal who wish to learn how to schedule and control a project.

Students should have:

  • The ability to use a personal computer and understand the fundamentals of the operating system,

  • Experience using application software such as Microsoft Office and

  • An understanding of how projects are planned, scheduled and controlled, including understanding the project management processes applicable to your projects.

Earn PDUs & Renew PMP Certification – Oracle Primavera P6

Earn 3 Technical PDUs & 2 Strategic PDUs for PMP Renewal as per PMI Talent Triangle

Created by Team SFN - Trained more than 70000+ professionals across the Globe

"]

Students: 147, Price: $19.99

Students: 147, Price:  Paid

As a project manager, it is your responsibility to come up with a realistic plan, and complete your project within the plan (Only if approved changes are there in your project then you have to complete your project within the revised plan).

Enroll in this course and understand P6 Professional's basic features & functionality to apply them to project management processes in your organization.

The Primavera P6 Professional training leads you through the entire project life cycle, from planning to execution. You'll develop a thorough understanding of how to plan, schedule, and control the project.

Oracle Primavera is a robust, fully-featured Enterprise Project Portfolio Management solution that provides superlative project and product management, control and collaboration capabilities with integration support to various ERP systems software including Oracle's and SAP's. Primavera facilitates effective planning and scheduling, reporting, team collaboration, resource allotment and sharing, portfolio and risk management functions across enterprises for enhanced productivity.

Primavera P6 Intermediate

Learn Primavera P6 Intermediate Level Skills

Created by Gavin Drysdale - Project Controls Specialist

"]

Students: 139, Price: $89.99

Students: 139, Price:  Paid

This course follows on from my Primavera P6 Beginners Course. The Course Objectives cover the fundamental steps bring your skills up to Intermediate Level. The concepts taught in the course will apply to the schedule development of small to mega projects.

The course content applies all of the P6 releases from Version 8.3 onwards. It is designed to be viewed in conjunction with Primavera P6 which is available as a demo download from the Oracle website.

If you are a Project Manager, Project Scheduler, Project Controller, Engineer, Cost Controller, or anyone else who wishes to upgrade their Primavera P6 skills, then this course is for you.

You could also be migrating your skills from one of the other Planning Software Packages and want to get up and running quickly in Primavera P6.

You will find that the principles of scheduling you will learn in this course follow the guidelines for the DCMA 14-point Schedule Assessment Checking. This is often a pre-requisite of many companies today.

Is preferable, but not essential that the Primavera P6 for Beginners course has been completed because much of the scheduling material would have already been developed by the student. All relevant reference material will be available for download, as well as the required XER project file.

As with all of my courses, I provide a comprehensive real-world exercise (that I have personally worked on) for students to complete in their own time. Answers to exercise questions will be provided in a final session. I encourage all students to complete the exercise.

For those students who are interested, there is a fully illustrated Step-by-Step eBook available for this course (143 pages).  You'll find full details in the Bonus Learning Section.

Thank you and enjoy the course!